PwC’s Global Data Centre Outlook (2 Sep 2026) puts annual data-center capex at roughly $800 billion in 2026, rising toward $1.8 trillion a year by 2050 in the central case.
Without compute, we lose.
This page is not a permission slip for sloppy projects. It is a request to stop treating data halls as a unique environmental crime while Florida already runs much larger water and land systems in plain sight.
Same study: $31.6 trillion of global data-center capex through 2050, upside near $50 trillion. The United States is modeled at 48% — $15.1 trillion.
Goldman Sachs Research (Aug 2026): about $1.02 trillion of global AI-related capex in 2026, including about $581 billion inside the United States.
If the United States does not host that capacity, the work, the models, the industry, and the military advantage go somewhere else. Compute is the factory floor of AI.
Rivals do not need you to like them. They need you to delay.
The U.S. intelligence community’s 2026 Annual Threat Assessment is public. China is the most capable competitor in AI and aims to displace the United States as the global AI leader by 2030. China is also named as the most active persistent cyber threat to U.S. government, private-sector, and critical-infrastructure networks.
What is sourced
- ODNI 2026 ATA: China intends to lead AI by 2030.
- Compute, chips, power and cooling are the binding constraints.
- Local vetoes and water scare-stories raise U.S. cost and slip schedules.
- A delayed U.S. hall is a free year for a rival hall.
What this page will not invent
- No fabricated list of foreign-owned protest groups in a named Florida county.
- No claim that every neighbor with a sign is an agent.
- No fake dollar figure for adversary spend on Florida Facebook ads.
- If a specific funding trail is found, it gets a source.
Florida locations and facilities
Data centers sit near the bottom of ordinary commercial geography. That is not an argument that impacts are zero. It is an argument that Florida already accepted far larger networks without a moral panic.
Amazon includes fulfillment, sortation, distribution and delivery. Cannabis figures are approved dispensing locations, not grow-room buildings. Golf is a course count.
Water: the scale people leave out
Million gallons per day. Categories are not identical. Read the method notes before quoting.
Florida cannabis is large, licensed, and thirsty by design.
Medical marijuana in Florida is a vertically integrated license: cultivate, process, transport and dispense. Industrial indoor agriculture plus a statewide retail chain.
Active qualified patients cited with the Sept. 11, 2026 license order (MJBizDaily, 16 Sep 2026).
Approved dispensing locations in early-September 2026 reporting. Trulieve alone was at 170 Florida stores.
Florida awarded 22 additional vertically integrated MMTC licenses on Sept. 11, 2026.
Who runs the big ones
Golf, Bass Pro, condos, flying communities.
Florida ranks first in U.S. course supply. DEP 2024 reuse: 519 courses on reclaimed water, 123.9 MGD, 66,970 reported acres. Freshwater golf wells sit on top of that.
Florida directory count, September 2026. Miami hall published at 100,000+ sq ft plus a 19,000-gallon aquarium. No statewide chain water census is public.
Residences on reclaimed irrigation in DEP 2024. That is only reuse customers. Potable lawn taps push the number up, not down.
“Closed loop” must mean the right thing.
Specify this
- Direct-to-chip liquid cooling
- Sealed recirculating coolant loop
- Dry coolers that reject heat to outside air
- No evaporative cooling tower
- No continuous cooling-water makeup
- Meter and publicly report remaining domestic water use
Do not confuse it with this
- A “closed” internal loop tied to an evaporative tower
- Cooling-tower evaporation
- Regular blowdown and chemical treatment
- Continuous replacement water
- Unreported peak-day withdrawals
- Marketing language with no binding design standard
Method, limits and sources
Why some numbers say “approximately”
Store networks change weekly. The 123 data-center figure is operational records on DC Map’s August 2026 Florida file.
Why there is no fake statewide land total
Florida does not publish audited parcel acreage for every chain or MMTC campus here. Location counts are shown directly.
Why cannabis water is not a single bar
OMMU publishes patients, licenses and dispensations. It does not publish a statewide gallon total for cultivation.
Why $20 trillion is not on the hero stat
PwC’s sourced long-run figure is $31.6 trillion through 2050, not a current installed-cost stock. Goldman’s sourced near-term figure is about $1 trillion of AI-related capex in 2026.
- DC Map — Florida, Aug 2026 (123 operational / 154 tracked)
- Publix corporate facts
- USGS Florida water withdrawals 2015
- Florida DEP 2024 Reuse Inventory Report
- Florida DEP reuse activities
- UF/IFAS reclaimed water
- Meta closed-loop dry coolers
- Florida OMMU MMTC directory
- Florida OMMU weekly updates
- MJBizDaily — 22 MMTC licenses; 941,271 patients
- Marijuana Herald — 779 dispensaries / Trulieve 170
- Trulieve June 2026 investor presentation
- 850 Business — Trulieve Jefferson County campus
- Indoor cannabis water intensity literature (not a Florida census)
- Bass Pro Shops Miami store page
- Bass Pro Florida directory, 13 stores, 18 Sep 2026
- Golf courses by state — Florida ~1,100
- PwC Global Data Centre Outlook, 2 Sep 2026
- Goldman Sachs — AI investment 2026
- ODNI 2026 Annual Threat Assessment
- DNI statement on the 2026 ATA
- MyAmerica.WTF
Access date for this rebuild: 18 Sep 2026. Refresh counts before paid ads, testimony or filings.